
26 August, 2026
Project description
Client: Unico Silver
Location: Cerro Leon & Joaquin projects, Santa Cruz Argentina
Industry: Mining
Pre-Feasibility Study (PFS) for the integrated Cerro León and Joaquín silver projects in Santa Cruz, Argentina. The study aims to define the optimal technical and economic configuration for the combined operation, covering mining, processing, infrastructure, environmental considerations, and life-of-mine planning.











You must be logged in to post a comment.